Rehabilitasi

Shaping what comes next

Thiess berkomitmen untuk pada dorongan klien untuk secara efisien memberikan hasil rehabilitasi dengan nilai lingkungan yang langgeng/tahan lama.

#Pendekatan kami

Thiess Rehabilitation is a dedicated service that transforms mine sites into safe, sustainable landscapes, creating long-term value for communities, industry, land-owners and the environment.

Kami merancang hasil yang memenuhi tujuan akhir penggunaan lahan, memathu kewajiban peraturan, dan memenuhi persyaratan penutupan jangka panjang. Kekuatan dari keahlian dan pengalaman rancangan kami paling baik ditunjukkan melalui hasil mengesankan yang telah kami capai dengan klien selama beberapa dekade. Kami mendukung hasil rehabilitasi dari tahap pengembangan awal proyek hingga tahap operasionalnya.

Planning

Practical, cost-effective rehabilitation designs and strategies that optimise landforms, minimise earthworks and manage project risks.

Rehabilitation planning services include:
• Rehabilitation planning, costing and scheduling
• Geotechnical engineering, final landform design and
constructability assessment
• Earthwork optimisation and material movement
reduction
• Closure planning support and project risk reduction.

Konstruksi

Spesialis lingkungan dan tim operasional kami menggunakan rancangan optimal sebagai dasar untuk pelaksanaan rehabilitasi progresif. Layanan konstruksi rehabilitasi kami meliputi bulk profiling dan pembentukan jarahan tambang; pembangunan struktur pengelolaan air, erosi dan pengendalian sedimen; persiapan permukaan akhir dan tanah lapisan atas; dan program revegetasi yang disesuaikan. Karena personel lingkungan kami bekerja sebagai bagian dari tim perencanaan teknis, pekerjaan rehabilitasi sepenuhnya terintegrasi dengan rencana tambang yang lebih luas. Hal ini memberikan keuntungan seperti pengurangan pergerakan material, peminimalan penanganan ulang, peningkatan produktivitas, pengurangan biaya konstruksi, dan peningkatan hasil lingkungan.

Pengawasan dan Pemeliharaan

Spesialis kami dapat secara akurat memantau keberhasilan rehabilitasi, meninjau kesehatan dan keanekaragaman vegetasi, dan mengidentifikasi erosi, menggunakan drone untuk merekam footage area yang direhabilitasi. Teknologi ini dengan hemat biaya menyediakan gambaran lengkap tentang area lahan yang luas dan gambaran yang lebih akurat tentang kinerja rehabilitasi. Pada akhirnya klien mendapatkan bukti yang kuat tentang hasil rehabilitasi, mendukung sertifikasi progresif lahan yang direhabilitasi, dan mengurangi kewajiban rehabilitasi yang sedang berlangsung.

Case Study

Closing the loop at Muswellbrook

Thiess Rehabilitation completed 156 hectares of land restoration works at the Muswellbrook mine in 2025, completing a lifecycle of work after the Thiess Brothers were awarded the initial mining contract at the project in 1944.

The rehabilitation works included engineering, design, geotechnical control, bulk earthworks, civil works, and seeding with native species and improved pasture. By optimising the reference design and applying effective risk controls, the team reduced material movement by 20%, achieved cost savings, and met design tolerances using a quality control approach recognised by the New South Wales Resource Regulator as leading practice.

12,580 hectares rehabilitated

#12,580 hectares rehabilitated

Globally, since 2007

*As of 2026

"Thiess Rehabilitation has been an outstanding partner at Mount Pleasant Operation, consistently delivering rehabilitation outcomes that meet design, safety, and environmental objectives.

Their team combines strong technical capability with a genuine commitment to quality, successfully delivering geomorphic landform construction, drainage works, shaping, topsoil placement, ripping, seeding, and tree planting.

Supported by effective project management and a strong sense of ownership, Thiess has proven to be a reliable and trusted contractor across all stages of mine rehabilitation."

- Michael Redman, General Manager Operations, MACH Energy

#Case Studies

Lake Vermont

Lake Vermont

Autonomous Rehabilitation Earthworks

At Lake Vermont, Thiess has been operating one of the world’s largest active semi-autonomous tractor systems (SATS) fleets since 2021 for production and rehabilitation dozing.

Rehabilitation at Lake Vermont has included mine plan integration, topsoil management, water management construction and UAV mapping to support progressive rehabilitation of 480 hectares to date.

Kidston Pumped Hydro Project

Kidston Pumped Hydro Project

Purposing a legacy gold mine for renewable energy

The 250MW Kidston Clean Energy project was the first in the world to successfully transform a disused gold mine into renewable energy infrastructure. It is Australia’s first pumped hydro storage project in more than four decades and the third largest electricity storage device in the country.

Underground experts PYBAR, a Thiess Group company, delivered 970 metres of specialised raise boring shafts, critical for transforming mining pits into pumped hydro assets.

Duketon South Gold Mine

Duketon South Gold Mine

Progressive rehabilitation of an active hard-rock site

MACA, a Thiess Group company, has progressively rehabilitated approximately 177 hectares of Duketon South Gold Mine, delivering landform reconstruction, drainage systems, bulk earthworks, topsoil placement and seeding to support long-term closure objectives.

Rehabilitation has been integrated with ongoing mining operations and undertaken in consideration of the unique challenges of the Western Australian environment.

Yallourn & Loy Yang Mines

Yallourn & Loy Yang Mines

River diversion and ash pond management

RTL, a Thiess Group company, delivers mining, civil and rehabilitation scopes across the Yallourn and Loy Yang mines. This has included the award-winning Morwell river diversion through the Yallourn Mine and ongoing significant ash pond reclamation projects at the Loy Yang Mine.

RTL has completed extensive progressive rehabilitation on both sites, integrating final land use transformation with ongoing
mining operations.

Sustainability is at the heart of our business

For Thiess this means including meaningful Traditional Owner engagement, Indigenous economic participation, and industry-leading ESG and decarbonisation initiatives into our rehabilitation projects. 

Learn more about our ESG commitments

#Hubungi kami

Please complete the form below

Hubungi kami untuk mempelajari lebih lanjut tentang bagaimana Thiess menciptakan nilai yang bertahan lama melalui rehabilitasi.

Beware of recruitment fraud

Thiess does not charge fees at any stage of recruitment. If you receive messages asking for money, travel costs, or personal documents via unofficial channels, it is a scam. 

  • Do not make payments or share sensitive information